MOROCCO - OCP SLURRY PIPELINE PROJECT
Tekfen Job No 325
Location Korigba-Jorf Lasfar, Morocco
Client Groupe Chérifien Des Phosphates
Contractor Tekfen Construction and Installation Co., Inc.
Final Project Value US$ 432.991.495
Tekfen Portion 100%
Commencement With the Contract signature
Completion 28 Months after Contrcat signature.
OCP Slurry Pipeline project has been designed to deliver several grades of phosphates to Jorf Lasfar Terminal. Project location is between Korigba and Jorf Lasfar.
Project duration is 28 Months after Contract signature.
Phosphate grades and throughputs listed below are based on design data received from OCP. The facilities are designed to handle a throughput of 30 Mt/y initially and 38 Mt/y in the future.
The project scope includes Detail Engineering, Procurement, and Construction (EPC) services to supply, install, and commission the facilities including all associated works .
Project consist of approximately 240 km of pipelines including the feeder lines , Doui Pump station, MEA Head Station, Halasaa pump Station and Jorf Terminal. Feeder pipelines from each wash plant pump station will deliver sequential batches of each grade to segregated tanks at the head station at MEA. From the head station sequential phosphate batches will be pumped through the main pipeline into storage tanks at the terminal. One slurry grade will be supplied to the local acid plants and all slurry grades will be supplied for export purposes.
The pipeline scope consists generally of:
Slurry feeder pump stations and pipelines from the wash plants to the central pipeline
Head Station as summarized below;
Pipeline Head Station
Main slurry pipeline from Head Station to Terminal
Daoui Feeder Pipeline
2. MEA Low Grade Feeder Pipeline
MEA High Grade Feeder Pipeline
Halassa Feeder Pipeline
Pipeline Terminal at Jorf Lasfar
SCADA and telecommunication facilities
Valve stations
Slurry storage and pump stations
Slurry feeder pipelines
Fresh water pipeline